Name of Work : Improvement and strengthening of Bhuj - Nakhtrana Road (Km. 5/2 to 50/0 of SH - 42) on Built Operate Transfer (BOT) basis
Location : Bhuj - Nakhtrana Road
Concessionaire : M. S. Khurana Infrastructure and Toll Road Private Limited. Ahmedabad
Project Cost : 35.04 Cr
Length : 45 Kms
Width of Carriage Way : 7.0 m
Month / Year of construction completion: February 2008
Concession Period : 13 years 3 months 2 days
Paved Shoulders 1.5 m
Hard Side Shoulders 1.0 m
No. Of Toll Sections 1

Frequently Asked Questions

As defined in the Concession Agreement signed for the particular Road Project. Generally it includes passenger cars only of an individual residing within defined range of Toll Plazas. Detail information and passes for Local Traffic can be availed from Toll Plaza.

A Board carrying Toll Notification is fixed on the Toll Plaza of the Project Highway. In addition to this, Toll Notification can be found on Website of GSRDC (www.gsrdc.com) for the Road Projects undertaken on PPP mode by GSRDC.

List of exempted vehicles for a particular section of highway is as per User Fee Notification of that section of highway. User Fee Notifications for Roads developed by GSRDC on PPP Mode is available on this website.

The exclusive right, license and authority during the subsistence of a Concession Agreement to construct, operate & maintain the Project for a specified period of time.

The Period of time during which a Concession is granted is known as Concession Period. It means the period beginning from the Appointed Date and ending on the Termination Date.
;